This project is operational in South Africa. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- South Africa
- Sector
- Renewable power
- Announced
- 20 January 2025
- Expected start
- 2025
About this project
The description is as the source gives it.
Henkel South Africa installed a 1.8 MW peak capacity solar farm at its Alrode manufacturing plant. The installation supplies 100% of the plant’s electricity needs during daytime operations from renewable sources, advancing carbon-neutral production goals. Evidence: "The solar farm, which boasts a peak capacity of 1.8 megawatts, is seamlessly integrated into the plant’s energy grid, ensuring uninterrupted and efficient energy use." — https://www.henkel.com/press-and-media/press-releases-and-kits/2025-01-20-henkel-south-africa-unveils-100-percent-sustainable-alrode-plant-with-solar-farm-installation-1911596
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.