International Terminal Electric Heat Pump System
This project is operational in New Zealand. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- New Zealand
- Sector
- Fuels and hydrogen
- Announced
- Not stated
- Expected start
- 2025
About this project
The description is as the source gives it.
Installation and commissioning of 11 industrial-scale electric heat pumps replacing a large natural gas-fired air conditioning plant in the international terminal (Pier B and upgrades). This electrification project phases out natural gas use. Evidence: "Auckland Airport has switched on a fleet of 11 industrial scale heat pumps in its international terminal – one of the largest installations of its kind in New Zealand – marking a major milestone in the airport’s plan to phase out natural gas and cut carbon emissions from its operations." — https://www.aci-asiapac.aero/media-centre/news/heat-pumps-take-off-one-of-new-zealand-s-largest-air-con-systems-goes-electric
Statuses, countries and reductions are as the public source states them, and may be out of date.