Skip to main content
Decarbonization project

International Terminal Electric Heat Pump System

This project is operational in New Zealand. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
New Zealand
Sector
Fuels and hydrogen
Announced
Not stated
Expected start
2025

About this project

The description is as the source gives it.

Installation and commissioning of 11 industrial-scale electric heat pumps replacing a large natural gas-fired air conditioning plant in the international terminal (Pier B and upgrades). This electrification project phases out natural gas use. Evidence: "Auckland Airport has switched on a fleet of 11 industrial scale heat pumps in its international terminal – one of the largest installations of its kind in New Zealand – marking a major milestone in the airport’s plan to phase out natural gas and cut carbon emissions from its operations." — https://www.aci-asiapac.aero/media-centre/news/heat-pumps-take-off-one-of-new-zealand-s-largest-air-con-systems-goes-electric

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project