Skip to main content
Decarbonization project

Iwaki Solar Power Plant Corporate PPA for Shinkansen

This project is operational in Japan.

Status
Operational
Estimated reduction
16,500 tCO2e, period not stated
Countries
Japan
Sector
Renewable power
Announced
15 January 2025
Expected start
2025

About this project

The description is as the source gives it.

JR East entered a corporate PPA to receive renewable electricity from the 31.5 MW Iwaki solar power plant starting April 2025, supplying power to the Yamagata-Akita Shinkansen and reducing Scope 2 emissions in its rail operations. Evidence: "From April 2025, Nozomi Energy's Iwaki solar power plant will be dedicated to supplying JR East with renewable electricity to partly power its Yamagata-Akita Shinkansen service in northern Japan through Tohoku EPCO. ... saving around 16,500 tons of carbon dioxide emissions" — https://nozomi-energy.com/wp-content/uploads/2025/01/Press-Release-Nozomi-Energy-to-provide-renewable-energy-via-pioneering-CPPA.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.