Loulo-Gounkoto Solar Power Expansion
This project is operational in Mali. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Mali
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
Barrick (80% owner/operator) at the Loulo-Gounkoto complex in Mali commissioned Phase 2 of its solar power plant, increasing renewable energy share in the micro-grid from 81% to 85% alongside battery storage. Evidence: "The commissioning of Phase 2 of the complex's solar power plant" — https://www.barrick.com/English/news/news-details/2024/loulo-gounkoto-delivers-another-value-creating-performance/default.aspx
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.