On-site Solar PPA at Shizuoka Plant

This project is operational in Japan.

Status
Operational
Estimated reduction
810 tCO2e a year
Countries
Japan
Sector
Renewable power
Announced
18 April 2025
Expected start
2025

About this project

The description is as the source gives it.

Toyo Seikan Co., Ltd. installed a 1.6 MW on-site self-consumption solar power system at its Shizuoka Plant under a PPA model with TESS Engineering and Mizuho-Toshiba Leasing. The system began supplying renewable electricity in March 2025, generating about 1,919 MWh annually for the plant's use. Evidence: "Use of renewable electricity began in March 2025 as part of a power purchase agreement (PPA) 1 . ... The generation capacity is approximately 1.6 MW, with an estimated annual power generation of about 1,919 MWh, which will all be supplied to the Shizuoka Plant, resulting in an expected reduction of approximately 810 tons of CO2 emissions annually 2 ." — https://www.tskg-hd.com/en/news/detail/20250418_newsrelease_e.html

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project