This project is operational in Japan.
- Status
- Operational
- Estimated reduction
- 1,700 tCO2e a year
- Countries
- Japan
- Sector
- Renewable power
- Announced
- 27 April 2023
- Expected start
- 2023
About this project
The description is as the source gives it.
Daio Paper Group installed on-site PPA solar power systems totaling 2.665 MW at three factories. The systems are expected to generate approximately 3.7 million kWh annually, reducing CO2 emissions by about 1,700 t per year. One installation at the Shimada site added 155 kW to an existing 250 kW system and became operational in February 2023. Evidence: "大王製紙は4月27日、同社グループ3工場にオンサイト型PPA(電力購入契約)モデルにより、自家消費型の太陽光発電システムを設置したと発表した。3工場の合計出力は2.665MWで、年間発電量は一般家庭約850世帯分に相当する約370万kWhを見込み、年間CO2削減効果は約1700tとなる。" — https://project.nikkeibp.co.jp/ms/atcl/19/news/00001/03344/
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.