Skip to main content
Decarbonization project

ReNew Power 50 MW Wind-Solar Hybrid Group Captive PPA for Bharuch

This project is operational in India.

Status
Operational
Estimated reduction
121,446 tCO2e a year
Countries
India
Sector
Renewable power
Announced
August 2022
Expected start
2023

About this project

The description is as the source gives it.

DCM Shriram sources up to 50 MW (initially 40.4 MW) of wind-solar hybrid renewable power via SPV with ReNew Power under a 25-year group captive arrangement for its chlor-alkali chemicals plant in Bharuch, Gujarat. This replaces grid or captive coal power, reducing Scope 2 emissions in own operations. Sourcing commenced in 2023 with full capacity contributing to ~35% non-fossil energy mix. Evidence: "DCM Shriram has signed a CPA for a period of 25 years. ... successfully started sourcing upto 40.4 MW of renewable energy (wind-solar hybrid) from its special purpose vehicle (SPV) setup with ReNew Power Limited" — https://www.chinimandi.com/dcm-shriram-signs-agreement-with-renew-power-to-source-50-mw-renewable-energy/

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.