Renewable Energy Procurement for Distribution Centers
This project is operational in Japan. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Japan
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2022
About this project
The description is as the source gives it.
MonotaRO switched electricity supply at its Kasama DC and Ibaraki Central SC to substantially renewable sources via non-fossil certificates with tracking information. The change took effect from July 2022 at the sites and was confirmed as of March 2023. This directly reduces Scope 2 emissions from the company's own logistics operations in Japan. Evidence: "As of March 2023, we have switched to substantially renewable energy sources for electricity used at our own properties, Kasama DC and Ibaraki Central SC, through the purchase of non-fossil certificates with tracking information." — https://corp.monotaro.com/en/ir/sustainability/sustainability_02.html
Statuses, countries and reductions are as the public source states them, and may be out of date.