Sanand Plant On-Site Solar Expansion
This project is operational in India. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- India
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2021
About this project
The description is as the source gives it.
Colgate-Palmolive (India) Limited commissioned a 1.0 MW DC (0.8 MW AC) in-house solar facility at its Sanand, Gujarat plant in 2021 and expanded it by an additional 0.250 MW DC (0.2 MW AC) to increase renewable energy generation and reduce grid dependency for its manufacturing operations. Evidence: "The Sanand plant commissioned its 1.0 MW DC (0.8 MW AC) in-house solar facility in 2021. Building on this, we expanded capacity by 0.250 MW DC (0.2 MW AC) in line with the Gujarat Electricity Regulatory Commission's 2022 amendment." — https://www.colgateinvestors.co.in/annual-report-2025/environmental-stewardship-optimize.html
Statuses, countries and reductions are as the public source states them, and may be out of date.