Senyiur 1.5 mWp Solar Power Plant
This project is operational in Indonesia. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Indonesia
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
PT Bayan Resources commissioned a 1.5 mWp solar photovoltaic plant near its Senyiur barge loading facility in East Kalimantan, Indonesia, covering approximately 1 hectare. The on-site renewable installation supports the company's mining and logistics operations by generating clean electricity for internal use. Evidence: "In 2025, our 1.5 mWp solar farm near our Senyiur barge loading facility in East Kalimantan, covering an area of approximately 1 hectare and consisting of ..." — https://www.bayan.com.sg/cfind/source/files/annual-report/sustanaibility-report/sustainability-report-byan-2025-ojk.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.