Shafter Solar and Battery Storage Installation
This project is operational in United States. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Renewable power
- Announced
- 14 February 2024
- Expected start
- 2024
About this project
The description is as the source gives it.
PFG installed a solar PV and battery storage system at its Shafter, CA facility as part of a portfolio initiative to generate onsite renewable energy, reduce grid demand, and lower operational emissions in preparation for fleet electrification. Evidence: "The solar and battery storage project is part of a larger portfolio partnership, that will increase sustainable operations, reduce costs, and upgrade onsite infrastructure for future EV charger integration at select nationwide PFG facilities." — https://www.einpresswire.com/article/688581156/gridmarket-announces-latest-clean-energy-project-in-portfolio-energy-upgrade-initiative-for-performance-food-group
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.