Solar Panel Systems at StarWorld Hotel and Hotel Okura Macau

This project is operational in Macao SAR China. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Macao SAR China
Sector
Renewable power
Announced
Not stated
Expected start
2022

About this project

The description is as the source gives it.

Galaxy Entertainment Group installed on-site solar panel systems at StarWorld Hotel and Hotel Okura Macau in 2022. The systems generate renewable electricity for on-site use, powering LED lighting and contributing to reduced grid electricity consumption at these properties in Macau. Evidence: "In 2022, GEG installed solar panels at Hotel Okura Macau and StarWorld Hotel. The solar panel systems generate 630 kWh of renewable energy monthly, saving 7,560 kWh of electricity annually." — https://apricot-deer-ee9e.squarespace.com/s/13-Gold_CC_Galaxy-Entertainment-Group_Galaxy-Entertainment-Group-Environmental-and-Sustainability-Pr.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.