Thousand Oaks On-Site Solar Installation
This project is operational in United States. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2023
About this project
The description is as the source gives it.
Takeda installed nearly 7,000 solar photovoltaic panels at its manufacturing site in Thousand Oaks/Newbury Park, California, to provide approximately 40% of the site's on-site electricity needs. The project was approved in 2022 and became operational around 2023-2024 as part of efforts to increase renewable energy at own sites. Evidence: "Drugmaker Takeda Pharmaceuticals will remove 148 trees—none officially protected under city law—to make room for a solar farm to help power the company’s manufacturing plant in Newbury Park." — https://www.toacorn.com/articles/biotech-firm-removing-148-trees-to-add-solar-installation/
Statuses, countries and reductions are as the public source states them, and may be out of date.