Getlink S.E. (GET.PA) and Alstom SA (ALO): reported emissions and climate targets side by side
Each figure is the company’s latest reported year, linked to its filing. Figures as of November 2026.
Scope 1 and 2 are the greenhouse gases from a company’s own operations and the energy it buys; Scope 3 is everything else in its value chain. All figures are in tonnes of CO₂ equivalent (tCO₂e). Industry is the company’s sector on the SBTi registry, the Science Based Targets initiative that checks corporate climate targets.
Similar railroads companies to add
- + Genesee & Wyoming Inc.about 600,000 tCO₂e Scope 1 and 2 in 2023. Same size band on the SBTi registry
- + CAF – development bank of Latin America and the Caribbeanabout 1,400 tCO₂e Scope 1 and 2 in 2023. Same size band on the SBTi registry
- + Norfolk Southern Corporation (NSC)about 4.2 million tCO₂e Scope 1 and 2 in 2024. Same size band on the SBTi registry
Scope 1 and 2 emissions
- Only 8 railroads companies have a recent figure, too few to place Getlink S.E. (GET.PA) in its industry.
- Only 8 railroads companies have a recent figure, too few to place Alstom SA (ALO) in its industry.
The latest figures come from different years (2025 and 2026), so the gap partly reflects timing.
These are absolute footprints, so they measure a company’s size as much as its efficiency. A large company can be efficient and still sit near the top.
tCO₂e, latest reported year for each company
- Getlink S.E. (GET.PA)39,031 tCO₂e, 2025
- Alstom SA (ALO)219,571 tCO₂e, 2026
Scope 3 emissions
- Scope 3 is 74% of Getlink S.E. (GET.PA)’s total reported footprint.
tCO₂e, latest reported year for each company
- Getlink S.E. (GET.PA)110,172 tCO₂e, 2025
- Alstom SA (ALO)Not reported
Change over time
The SBTi cross-sector pathway for 1.5°C asks for about 4.2% less each year. A change needs two reported years at most three years apart, the latest from 2023 or later.
Average change a year, compound, between the two latest reported years
- Getlink S.E. (GET.PA)down 6.6% a year2024 to 2025
- Alstom SA (ALO)up 16.5% a year2023 to 2026
- SBTi 1.5°C referencedown 4.2% a year
Climate targets
Getlink S.E. (GET.PA)
- Near-term target
- Validated, aligned with 1.5°C
- Target year
- 2025
- Net-zero target
- None
Alstom SA (ALO)
- Near-term target
- Validated, aligned with 1.5°C
- Target year
- 2030
- Net-zero target
- None
Carbon credit retirements
Tonnes of CO₂e retired, where the company is the named beneficiary
- Getlink S.E. (GET.PA)None found
- Alstom SA (ALO)None found
Retirements come from public registries (CarbonPlan and VROD) and cover November 2024 onward, matched to companies by name, so a missing figure does not mean a company never retired credits.
Sources
Getlink S.E. (GET.PA)
Alstom SA (ALO)
How the comparison works
- Each company’s figures are its latest reported year in the emissions registry, from its own filings. A gap means the company has not reported that figure; it is never filled in or estimated.
- A zero or implausibly large figure (Scope 1 and 2 above 100 million tCO₂e, or Scope 3 above 1 billion) is shown with a “figure under review” tag and never ranked.
- The industry position compares a company’s latest Scope 1 and 2 figure from 2023 or later with every other company in the same SBTi industry that has one. It is shown only when at least 10 companies report.
- Profiles Carbon3 prepared ahead of a claim are shown here but left out of industry statistics.
Need a deeper peer review for your company?
Contact us