Battery Energy Storage System for HYDROpower
This project is operational in Italy.
- Status
- Operational
- Estimated reduction
- 2,500 tCO2e, period not stated
- Countries
- Italy
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2026
About this project
The description is as the source gives it.
BESS4HYDRO integrates a 4 MW/8 MWh Battery Energy Storage System with the existing 43.4 MW Dossi reservoir hydropower plant in Bergamo, Italy, creating a hybrid renewable energy system that boosts grid stability, flexibility, and efficiency. The BESS functions as a virtual pumping reservoir, storing surplus renewable energy electrically for rapid dispatch during peak demand and ancillary services, while leveraging existing infrastructure to cut costs. This innovation reduces fossil fuel dependency, cuts GHG emissions, and aligns with EU Green Deal objectives by advancing scalable net-zero technologies.<grok:render type="render_inline_citation"><argument name="citation_id">68</argument></grok:render><grok:render type="render_inline_citation"><argument name="citation_id">69</argument></grok:render>
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.