Dalkia Biomass Boiler and Heat Recovery at Maubeuge Plant
This project is announced in France. The source does not give a quantified reduction for this project.
- Status
- Announced
- Estimated reduction
- Not quantified in the source
- Countries
- France
- Sector
- Buildings and efficiency
- Announced
- 24 November 2022
- Expected start
- 2025
About this project
The description is as the source gives it.
Renault Group partnered with Dalkia (EDF Group subsidiary) for a 15-year agreement to install a 15 MW biomass boiler and waste heat recovery systems at the Maubeuge plant. This will supply carbon-free heat and replace 65% of the site's gas consumption from local and renewable sources by 2025. Evidence: "Renault Group and Dalkia, an EDF Group subsidiary specialising in renewable energies, have signed a 15-year partnership to supply carbon-free heat to the Maubeuge Renault plant through the installation of a biomass boiler and waste heat recovery systems on site. With a capacity of 15 MW, this boilers should enable the plant to cover 65% of its gas needs from local and renewable sources by 2025." — https://media.renaultgroup.com/renault-group-is-accelerating-the-decarbonisation-plan-for-its-plants-in-france-and-innovating-with-new-partners-voltalia-engie-and-dalkia/
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. No fee to list or issue, commission only on trades and retirements.