Skip to main content
Decarbonization project

Stellantis Madrid Plant Flexible Electrification Project

This project is operational in Spain. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Spain
Sector
Renewable power
Announced
June 2024
Expected start
2025

About this project

The description is as the source gives it.

Stellantis partnered with GreenYellow to implement a flexible electrification system at its Madrid plant, including 12.4 MWp on-site solar PV (with 4.6 MWp ground-mounted), 25 MWh battery storage, and replacement of gas boilers with heat pumps. The integrated system optimizes self-consumption, reduces gas use by ~2.9 GWh/year, and cuts associated thermal emissions by 57%. Evidence: "The project includes, among other measures, the replacement of gas boilers with heat pumps, which will replace approximately 2.9 GWh of annual gas consumption and reduce the emissions associated with these thermal uses by 57%. It also incorporates 12.4 MWp of photovoltaic capacity for self-consumption..." — https://w3.windfair.net/wind-energy/pr/49726-industrial-decarbonization-flexible-electrification-solar-pv-battery-storage-energy-efficiency

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. No fee to list or issue, commission only on trades and retirements.

List this project